Washington, DC
Ronald Reagan National Airport
Scope/Solutions
The terminal, designed by Cesar Pelli, Design Architects, and Leo A. Daly, Associate Architects, has a Bermuda-style roof with a series of low-rise, stainless steel-clad domes clad with perimeter metal gutters. The curtain wall is free standing and rises forty-five feet above the concourse level to barrel arches at the top, which mimic the roof lines. Parson’s Management, the owner’s project manager, retained SGH to consult on the design of the building enclosure for the new terminal building, including curtain walls, skylights, windows, and metal and thermoplastic roof systems.
Highlights of SGH’s work on the project include the following:
- Reviewed project design drawings and specifications
- Worked with the manufacturer of the metal roofing system to redesign details for their standard system for the intricate metal domes and gutters at the roof perimeter
- Reviewed design concepts and materials for the project’s multiple single-ply roofs and waterproofed plazas
- Evaluated design issues relating to multiple skylights and glazing
- Consulted on the curtain wall, including an overall review of system concepts and worked with the manufacturer and fabricator/erector to develop viable details for the work
- Observed mockup testing of curtain wall and roof components
- Conducted quality-assurance field inspections during construction
Project Summary
Solutions
New Construction | Preservation
Services
Building Enclosures
Markets
Infrastructure & Transportation
Client(s)
Parsons Management Consultants
Specialized Capabilities
Condition Assessments | Preservation | Roofing & Waterproofing
Additional Projects
Mid-Atlantic
National Institutes of Health, North Drive Bridge
As the structural engineer of record on a design-build team, SGH designed a replacement bridge.
Mid-Atlantic
Bi-County East and West Water Tunnel
The Bi-County East and West Water Tunnel supplies potable water to Montgomery and Prince George’s Counties in Maryland. When the main riser of the new tunnel failed during initial acceptance tests, the owner retained SGH to investigate.