Provincetown, MA
MacMillan Pier Floating Deck
Scope/Solutions
The concrete floating dock on MacMillan Pier incorporated concrete-encased polystyrene floats with light reinforcement in the top and bottom slabs. During its first year of service, the dock failed during a winter storm. Over the next two years, SGH consulted on the investigation and rehabilitation of the structure.
When the storm hit Provincetown Harbor, most of the finger piers broke away from the main dock. At MacMillian Pier, inspectors found cracks on the floats under the wood whalers and on the unreinforced side walls, and several floats fractured as workers tried to remove them from the water.
In this multiphase project, SGH performed the following services:
- Conducted a structural evaluation of the floating dock
- Investigated the damage, inspecting both failed and disassembled concrete-encased polystyrene floats
- Performed wind speed and wave height analyses and determined the loads acting on the structure at the time of the failure
- Developed a temporary repair program that enabled the town to use the float in the upcoming summer season
- Analyzed the risk of failure and determined the following:
- High winds and waves could break up the floats or damage the wood whaler system
- Cracking of the polystyrene floats could result in their disintegration
- Unreinforced concrete was prone to spalling and separation from the polystyrene
- Defined necessary maintenance, including concrete repairs and side reinforcement, for the reassembled floats while they were in temporary service
- Developed recommendations for dock replacement
Project Summary
Solutions
Failure Investigation | Repair & Rehabilitation
Services
Structures | Performance & Code Consulting
Markets
Infrastructure & Transportation
Client(s)
Town of Provincetown
Specialized Capabilities
Repair & Strengthening | Marine & Civil Works | Risk & Resilience Assessment
Key team members
Additional Projects
Northeast
Lowell Regional Transit Maintenance Facility
Our team then designed the upgrades and provided construction administration services. At the time, the array was the largest ever installed on a public transit facility in the state.
Northeast
Museum of Science Parking Garage
Working for the owner, SGH assessed the condition of the concrete garage and recommended a rehabilitation program to extend the useful life of the structure.