Marlborough, MA
Massachusetts Water Resource Authority, Walnut Hill Treatment Plant, Cosgrove Intake Pipeline
Scope/Solutions
The Cosgrove Intake pipeline, a 144 in. dia. prestressed concrete cylinder pipe (PCCP), at MWRA’s Walnut Hill Water Treatment Plant Project was completed in early 2004 as a part of the water supply system for the City of Boston. Less than a year after construction of the pipeline, a large leak of approximately 700 gpm developed near a deep manhole chamber in a section of the pipeline with multiple elbows. SGH provided emergency response and evaluated the risk of failure resulting from the leak, inspected the pipeline to determine the cause of the leak, and developed a repair scheme.
For this project, SGH:
- Performed internal inspection of the leaking pipe using a diver during a brief shutdown while the line was in operation
- Evaluated the structural safety due to the combined effects of internal pressure, dead loads, prestress, and hydraulic pressure-induced thrust at elbows
- Internally inspected and measured all harnessed joints to determine if any joints opened more than the design limits, inspected the pipeline for visible signs of anomalies, and externally inspected the leaking joint
- Designed repairs that included welding of the leaking joint and soil grouting.
Project Summary
Solutions
Repair & Rehabilitation
Services
Structures | Advanced Analysis
Markets
Infrastructure & Transportation
Client(s)
Barletta Heavy Division
Specialized Capabilities
Repair & Strengthening | Buried Infrastructure | Failure Analysis
Key team members
Additional Projects
Northeast
Massachusetts Bay Transportation Authority, Charles/MGH Station
As part of the complete rebuilding and reconfiguring of the station, the contractor needed to remove an existing pier supporting the viaduct. SGH designed a load-transfer system that could be installed and utilized within the single weekend shutdown permitted by the MBTA.
Northeast
Reservoir Woods Parking Garage
The owner of Reservoir Woods sought to provide additional parking space in a new garage, which consists of a basement level and four elevated parking levels with 923 parking spaces. We provided project management, coordination, and structural engineering services for the 280,000 sq ft garage.