Curtis Bay, MD
Brandon Shores Power Plant
Scope/Solutions
Brandon Shores Power Plant (BSPP) has a proactive inspection and repair program for circulating water and service water pipelines, including prestressed concrete cylinder pipe (PCCP), steel pipe, ductile iron pipe, and others with diameters ranging from 16 in. to 102 in. Over the years, SGH assisted BSPP on several projects by performing condition assessments, designing internal and external repairs for pipes, and providing field engineering services during repairs.
Our work on the BSPP pipelines have included the following:
- Performing condition assessments of distressed pipes, analyzing failure risk, and prioritizing repairs to optimize available resources for pipe repairs during outages
- Evaluating existing repairs and recommending maintenance or repairs
- Designing and developing drawings and specifications for new repairs, including internal and external carbon fiber-reinforced polymer (CFRP) repairs, external post-tensioning, and concrete encasement
- Assisting with soliciting and reviewing contractor bids
- Reviewing submittals prepared by repair contractors
- Providing full-time field engineering support during repair projects
Highlights of our construction engineering services include the following:
- Inspecting repair work through various stages, including pipe surface preparation, material preparation, installation of the liner, and curing
- Documenting repair procedures and installation conditions
- Witnessing pull-off tests performed by the contractor on mockup areas
- Performing tension tests of CFRP witness panels in our laboratory
- Performing degree of cure tests on epoxy samples collected from CFRP repairs to verify adequate curing prior to placing the pipeline back in service
Project Summary
Solutions
Repair & Rehabilitation
Services
Structures | Advanced Analysis
Markets
Infrastructure & Transportation
Client(s)
Raven Power | Structural Technologies | Fibrwrap Construction, Inc.
Specialized Capabilities
Repair & Strengthening | Buried Infrastructure | Risk & Resilience Assessment
Key team members
Additional Projects
Mid-Atlantic
The Colonade Apartments Parking Structure Demolition
A portion of The Colonade’s parking structure, constructed with precast concrete plank supported on precast prestressed concrete beams, was beyond repair. SGH worked with the demolition contractor to develop construction documents for the selective demolition of the structure.
Mid-Atlantic
Back River Wastewater Treatment Plant, Egg-Shaped Digesters
Crom Corporation designed and built two 3.0 MG egg-shaped sludge digesters for Baltimore's Back River Wastewater Treatment Plant. SGH performed a peer review of the structural design of the new digesters.