Oakland, CA
Bay Area Rapid Transit, Earthquake Safety Program
Scope/Solutions
Carrying about 360,000 commuters every day, Bay Area Rapid Transit (BART) is an important part of the region’s transportation infrastructure. Knowing that the transit system could experience a major earthquake, BART initiated the Earthquake Safety Program to upgrade vulnerable and high-volume sections of the system to help them quickly reinstate service following an event. Under a term contract, SGH performed seismic assessments and assisted with upgrading this critical transit system.
Over a four-year period, SGH assessed the seismic vulnerability of station buildings and platforms, repair yard facilities, control towers, administrative offices, and parking garages system-wide. Highlights of our work include the following:
- Performed seismic evaluations and developed preliminary upgrade designs for seven elevated parking structures, maintenance facilities at Hayward and Daly City stations, administrative offices, and system control towers
- Developed seismic criteria for designing new parking structures and retrofitting existing parking structures
- Peer reviewed a seismic evaluation of the McArthur station
- Mentored and provided technical review for BART in-house engineers performing upgrades of some buildings and structures
- Acted as the engineer for record for the seismic upgrades of the Pleasant Hill parking structure, designed new shear walls within the frames adjacent to the speed ramps, and developed a solution resulting in no loss of parking spaces and allowing construction while the structure remained in service
Project Summary
Solutions
Repair & Rehabilitation
Services
Structures
Markets
Infrastructure & Transportation
Specialized Capabilities
Seismic Engineering
Key team members

Additional Projects
West
Calleguas Municipal Water District, Conduit North Branch
SGH was retained to evaluate the safety of the as-constructed steel liner and recommend remedial work.
West
Golden Gate Bridge North Anchorage Housing
The District determined the bridge could not reliably survive a repeat of the Great 1906 San Francisco earthquake and elected to undertake a multi-phase retrofit of the structure and foundations.