Boston, MA
Massachusetts Department of Transportation, Callahan Tunnel Vent Buildings
Scope/Solutions
The Massachusetts Department of Transportation (MassDOT) owns several buildings housing large air exchangers to ventilate the Callahan Tunnel that connects East Boston and downtown. On the East Boston side of the tunnel, the buildings’ walls exhibited ongoing deterioration, including visible out-of-plane bowing, detachment of the brick masonry from the cinder-block backup wall, and partial collapse. SGH served as the structural engineer of record for the assessment and restoration project to address the distressed masonry walls.
SGH evaluated the 1950s vent buildings to understand existing conditions and evaluate options for repairs. Highlights of our work include:
- Using findings from our hands-on survey with laser scanning performed by another firm to develop topography plots showing the magnitude of outward bowing
- Assessing the stability of the buildings’ composite masonry walls
- Developing construction documents to restore and replace portions of the brick and masonry facade elements, while maintaining the buildings’ aesthitics and character
Project Summary
Solutions
Repair & Rehabilitation
Services
Structures | Building Enclosures
Markets
Infrastructure & Transportation
Key team members
Greggrey Cohen
Structural Repair and Rehabilitation Division Head, Boston
Additional Projects
Northeast
MBTA Quincy Commuter Boat Terminal
The top of the wall moved outward and the soil behind the wall subsided several feet. SGH led a multi-disciplinary team to evaluate the seawalls and concrete wharf, recommended remedial work, and designed seawall and wharf stabilization measures.
Northeast
Reservoir Place Garage
When the owner observed cracked and spalled concrete throughout the garage, they asked SGH to perform a condition assessment and develop a rehabilitation program to extend the useful life of the structure.