Chicago, IL
111 East Wacker Drive
Scope/Solutions
A law firm occupying two floors of 111 East Wacker Drive was expanding their offices to the floor below. As part of the fitout design for the new space, the firm wanted to modify an existing circular stair connecting the upper two levels and add a new stair structure to extend the existing stair down to the level below. SGH provided structural engineering services for the stair and associated modifications to the existing building.
SGH served as the structural engineer of record for modifications to the existing stair, the new stair structure, and portions of the 1960s building supporting the stair. Highlights of our work include:
- Evaluating the existing circular stair for new wood cladding and glass guards
- Designing a new circular steel stair structure
- Performing a vibration analysis and designing the new and existing stair structures to satisfy recommended guidelines in AISC 360 and Design Guide #11
- Evaluating the effects of the new stair and floor opening on the reinforced concrete building structure
- Designing supplemental steel framing for the existing concrete waffle slab floor system to transfer existing stair loads to the base building
Project Summary
Solutions
New Construction
Services
Structures
Markets
Commercial
Client(s)
HED Design
Specialized Capabilities
Repair & Strengthening
Key team members

Additional Projects
Midwest
USDA National Center for Agricultural Utilization Research
The USDA engaged LSY Architects & Planners (LSY) and SGH to evaluate the building enclosure and recommend options for restoring the facades to their original appearance.
Midwest
Hess Corporation Tioga Office Complex
Constructed in 2009, the Tioga Office Complex is the administrative hub for Hess Corporation’s Bakken Oil Field operations. After occupying the complex, Hess personnel observed water leakage in the office building. SGH investigated the cause of leakage and recommended options for repairs.